Projects

Meadowvale Tennis Club LED Upgrade

Project Details

Client: Meadowvale Tennis Club
Year: 2019
Lighting Design: Al Read Electrical / Signify (Philips)
Installation: Al Read Electrical
Specification: Philips Clear Flood BVP 651

Meadowvale tennis approached Al Read Electrical to upgrade their existing court lighting to LED. The tennis club based in Blackrock Co. Dublin has 6 all-weather courts with a membership of approx. 500 and were looking for a low maintenance and efficient solution to their dated floodlighting.

Using the existing poles on site Al Read Electrical in collaboration with Philips/Signify provided a design aimed at reaching an average light level of 500 luxusing 8 clear flood lanterns per court. Retrofit installation was completed in 3 days minimising the disruption to the clubs members. Night time adjustments and light checking were carried out prior to commissioning in February 2019. With instant re-strike and low maintenance this LED retrofit was the perfect solution for Meadowvale.

AL READ Electrical Co. Ltd.

Depot

Castle Buildings
Damastown Way
Mulhuddart
Dublin 15

Phone: 01-8614844
Fax: 01-8614845
Email: phil@alreadelectrical.com
Email: carolyn@alreadelectrical.com

Send us a message...

© 2022 Al Read Electrical | Design, Development and Security by Web Watchdog.
Web Watchdog | Safeguard your website from malware and hacking.
AL READ Electrical Co. Ltd